  • obstruct with, or as if with, a dam
    1. dam the gorges of the Yangtse River
    Synonym:dam

双语例句

  • Therefore, protective measures for preventing tailing dam breach should be taken from the respects of improving the design of flood control ability, strengthening the stability of the dam and tightening up the management.
    因此,预防溃坝的环境风险防护措施,要从防洪设计、增强坝体稳定性及加强管理等方面进行。
  • After the two solutions, in down dam selection it is also under the same technical and economic comparison of the dam with the up dam, finally the concrete arch dams is selected.
    在选定这两个方案后也是通过和在上坝址选择过程一样的方法对下坝址进行了技术经济比较,最终选定下坝址以混凝土拱坝为代表坝型。
  • Thus it is very pressing for us integrating digital asset of TV media better, establishing the theory of digital asset management ( DAM), setting up operation modes and evaluation methods, etc..
    因而,对于如何更好的整合电视媒体的数字资产,构建基于数字资产管理(DAM,DigitalAssetManagement)的理论、运营模式及评价方法等,便成为当务之急。
  • In this paper, mainly based on arranging data with well pumping tests in dam foundation and sum up the laws of flows under the condition of deep well pumping, the useful dewatering calculation model and parameters were set up.
    本文主要通过坝基现场抽水试验试验资料整理,在揭示黄土坝基降水特性规律的基础上,确定可以反映现场抽水条件的的实用降水计算模型和参数;
  • This dam backs up the water to prevent floods.
    这个坝可以拦住水,以防泛滥。
  • On the basis of the technique of system simulation and the theory of queue stochastic simulation network, the queue network simulation model and the construction process simulation model for high roller compacted concret dam have been set up.
    本文根据碾压混凝土坝施工特点,采用计算机系统仿真技术和排队随机仿真网格理论,建立了高碾压混凝土坝施工交通运输系统排队网络仿真模型和高碾压坝施工浇筑过程仿真模型。
  • Dam foundation and dam construction quality come up to excellent standards and the project is elected the high-quality project.
    大坝工程的基础处理及填筑施工质量达到优良水平,被水电部评为优质工程。
  • Guangdong Police smashed secret private banks in "dam up" action
    广东警方截流行动痛击地下钱庄
  • The problem of uplift pressure being higher in non-overflow sections at the right bank of Shiquan dam has come up since the first dam safety inspection, a lot of studies and work have been done but got lower effect.
    石泉大坝右岸非溢流坝段扬压力超标问题自第一次安全定期检查提出后,曾做过大量的加固研究工作,但效果一直不明显。
  • The forecast model of dam deformation is set up on the basis of the time alignment decomposition method.